fbpx

Systems Spray-Cooled receives contract from Nucor Steel Brandenburg

Systems Spray-Cooled™, of The Systems Group, was selected to supply the electric arc furnace (EAF) Spray-Cooled™ equipment to Nucor Corporation’s new plate mill in Brandenburg, KY.  The new EAF greenfield project includes equipment for a single EAF operation. 

2021-11-23T13:08:38-06:00December 6th, 2020|Spray-Cooled™, The Systems Group|

Systems Contracting Advances 9 Positions – ENR Top 600 Specialty Contractors

Systems Contracting advances 9 positions to #341 in the 2020 Engineering News-Record’s Top 600 Specialty Contractors. El Dorado, Ark., November 19, 2020 – Systems Contracting Corporation, a leading contractor serving the industrial, municipal and commercial construction markets, has been named one of the Top 600 Specialty Contractors nationwide in an annual ranking report released by Engineering

2021-11-23T13:10:05-06:00November 19th, 2020|Contracting, The Systems Group|

Systems Spray-Cooled Delivers Equipment to Nucor Steel Gallatin

Systems Spray-Cooled Delivers Equipment to Nucor Steel Gallatin September 2020 Nashville, TN --Nucor Steel is expanding the steelmaking capacity at its flat-rolled sheet steel mill located in Ghent, KY.  As part of the expansion project, Nucor is adding a new 175-ton EAF that will increase the mill’s annual capacity from 1.6 million tons to approximately

2021-11-23T13:10:45-06:00September 15th, 2020|Spray-Cooled™, The Systems Group|

Systems Spray-Cooled receives an order to upgrade Optimus Steel EAF

Systems Spray-Cooled receives an order to upgrade Optimus Steel EAF July 2020 Nashville, TN -- Optimus Steel has placed an order for a furnace upgrade solution with Systems Spray-Cooled of The Systems Group.  The 4th quarter 2020 turn-key project includes a new Spray-Cooled™ Electric Arc Furnace (EAF) Roof, a new Spray-Cooled™ Elbow, the accompanying equipment that will replace

2021-11-23T13:11:19-06:00July 1st, 2020|Spray-Cooled™, The Systems Group|

Systems Spray-Cooled receives order from Steel Dynamics, Inc.

Systems Spray-Cooled receives order from Steel Dynamics, Inc. June 2020 Nashville, TN --Systems Spray-Cooled has received an order from Steel Dynamics, Inc. for Spray-Cooled™ equipment at their new mill in Sinton, TX currently under construction.   The 2021 project includes equipment for their (2) Electric Arc Furnaces.  The Spray-Cooled™ equipment will cover 100% of SDI’s furnace

2021-11-23T13:11:50-06:00June 1st, 2020|Spray-Cooled™, The Systems Group|

The Systems Group Named a Top Specialty Contractor

Arkansas Company #350 in 2019 ENR Top 600 Specialty Contractors Ranking El Dorado, Ark., October 2019 – The Systems Group (tsg.bz), a leading specialty contractor serving the industrial market with a focus on steel mills, has been named one of the Top 600 Specialty Contractors nationwide in an annual ranking report released by Engineering News-Record (ENR), a

Systems Spray-Cooled receives an order from Europe for a new Spray-Cooled™ EAF Roof and Elbow

October 2019, Nashville, TN --Industeel Belgium sa (“Industeel”) has placed an order for a new Spray-Cooled™ Electric Arc Furnace (EAF) Roof and Elbow with Systems Spray-Cooled.  The 2020 design-build project includes a new EAF Roof, Elbow, engineering, laser scans, and accompanying equipment that will replace its existing tubular equipment.  The full scope, in conjunction with

2021-11-23T13:14:16-06:00October 15th, 2019|Spray-Cooled™, The Systems Group|

The Systems Group is Making a BIG Economic Impact in Southern Arkansas

The Systems Group is Making a BIG Economic Impact in Southern Arkansas April 3, 2018, El Dorado, Arkansas - The Systems Group (TSG) is making a BIG difference in their hometown, manufacturing Spray-Cooled™ furnace equipment used in the steel making industry, one that in turn drives our national economy.  TSG started in El Dorado in

2021-11-23T13:15:36-06:00April 2nd, 2018|Fab & Machine, Spray-Cooled™, The Systems Group|

Ovako Hofors Puts Safety at the Forefront with the First Spray-Cooled™ EAF Roof in the Nordic Region

July 24, 2017, El Dorado, Arkansas – Swedish steel producer Ovako has awarded Systems Spray-Cooled the contract to modernize and increase safety on their Electric Arc Furnace (EAF) with the first Spray-Cooled™ roof in the Nordic region, located at their bar, billet, tube, and rings facility in Hofors, Sweden. After first being exposed to Spray-Cooled

2021-11-23T13:36:23-06:00July 24th, 2017|Spray-Cooled™, The Systems Group|

Systems Spray-Cooled News Flash: AIST Jan Front Cover, Safety First Article, & NYS Technical Article

Front Cover: Initial EAF Heat at Big River Steel of Osceola, AR Systems Spray-Cooled is proud to announce the appearance on the front page of the January 2017 AIST Iron & Steel Technology industry magazine. On the cover is Spray-Cooled's newest 165-ton furnace going into service at Big River Steel in Osceola, AR. Congratulations to

Go to Top