June 2020 Nashville, TNSystems Spray-Cooled has received an order from Steel Dynamics, Inc. for Spray-Cooled™ equipment at their new mill in Sinton, TX currently under construction.   The 2021 project includes equipment for their (2) Electric Arc Furnaces.  The Spray-Cooled™ equipment will cover 100% of SDI’s furnace cooling needs and will include the EAF shell, roof, and elbow.  The EAF sidewall will incorporate new ‘bump-outs’ to help protect the burners and refractory bricks.  The roof will be a new steep cone design for optimization and extended lifetime.

Steel Dynamics Inc.’s decision to purchase Spray-Cooled equipment was based on the success they have seen at their other EAF shops and on the need for the safest, lowest cost option (supply and maintenance) along with the extended life and performance for water-cooled equipment.

For further information about this Steel Dynamics project, contact The Systems Group, 214 N. Washington Ave. Ste 700, El Dorado, AR 71730; phone 870-862-1315; web spraycooled.tsg.bz; email info@tsg.bz.

# # #

Release Date: June 2020
Press Release File Downloads: